Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Más filtros











Base de datos
Intervalo de año de publicación
1.
PLoS One ; 18(7): e0284760, 2023.
Artículo en Inglés | MEDLINE | ID: mdl-37450477

RESUMEN

Large hydropower projects continue to be built in developing nations, despite their known negative impacts. Large-scale energy projects strain local infrastructure and reduce access to infrastructure for households that live near them. Here we investigate the link between large-scale hydropower projects and stress. Our results suggest that these projects create stress through two mechanisms: strains on community resources and through the process of displacement. We also ask how compensation and resettlement programs condition these relationships. Using data from the Madeira river basin in the Brazilian Amazon, we find that hydropower projects increase stress by reducing access to energy, water, sanitation and land. Compensation provided was not sufficient to moderate this effect.


Asunto(s)
Ríos , Agua , Brasil , Saneamiento
2.
J Environ Manage ; 336: 117240, 2023 Jun 15.
Artículo en Inglés | MEDLINE | ID: mdl-36870321

RESUMEN

Understanding social and environmental impacts and household adaptation strategies in the face of expansions in energy infrastructure projects is essential to inform mitigation and interventions programs that promote well-being. Here we conducted surveys in seven communities distributed across varying degrees of proximity to a hydropower dam complex in the Brazilian Amazon along about 250 km of the floodplain of the Madeira River. Based on interviews with 154 fishers from these communities, we examine how fishers perceived changes in fisheries yields, changes in the composition of fish species, and whether and how adaptation strategies had evolved 8-9 years after the dams' construction. Most respondents (91%) indicated declines in yields after the dams for both upstream and downstream zones. Multivariate analyses revealed statistically significant differences in the composition of species yields in pre-and post-dam periods for all communities and in both upstream and downstream zones (p < 0.001). The composition of yields diversified after the dams, with an apparent decline in yields of species of greatest market value (e.g., catfishes Brachyplatystoma spp., Pseudoplatystoma spp., and jatuarana Brycon spp.), and increases in yields of a set of other smaller bodied and faster growing species (e.g., 'branquinhas' Psectrogaster spp., Potamohinna spp., and sardines Triportheus spp.). Both downstream and upstream fishers indicated that fishing profits decreased since the dams' construction (76.8% and 67.9%, respectively). To cope with these changes, the majority of both upstream and downstream fishers (>70%) stated they have had to devote more time to fishing after the dams were built. The time fishers spend traveling to fishing locations also increased for upstream communities (77.1%), but not for downstream communities. Thirty-four percent of the interviewees changed the gear they use to fish after the dams construction, with twice as many mentioning uses of non-selective gear, such as gillnets, and declining use of traditional fishing gears such as castnets and a trap ("covi"). Fish consumption overall decreased: fish was consumed 'everyday' before the dams, but 1-2 times per week or rarely after the dams were built. Although the species that declined were those of high economic value, 53% of fishers stated fish prices have increased overall after the dams. These results shed light on the potential challenges faced by fishers and which adaptation strategies they have evolved to maintain livelihoods since the construction of the dams.


Asunto(s)
Aclimatación , Población Rural , Humanos , Animales , Ríos , Explotaciones Pesqueras , Brasil , Peces
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA