Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Más filtros











Base de datos
Intervalo de año de publicación
1.
Data Brief ; 47: 108971, 2023 Apr.
Artículo en Inglés | MEDLINE | ID: mdl-36875223

RESUMEN

A major full-scale experiment (the TULIP - Tunneling and Limitations on the Impact on Piles - research project) was conducted in 2020 on Line 16 of the Grand Paris Express project (France). Its objective was to analyze the tunnel boring machine-soil-pile interactions occurring during tunnel excavation near piled structures in the context of the geology of the Paris basin. This data paper summarizes the main measurements made during this experiment, namely: (i) the horizontal and vertical displacements measured in the ground, on the surface and in the thickness of the cover, (ii) the settlements of the pile heads, and the variations of the normal forces in the pile depth. These data, interpreted in two articles cited in the references, may be of interest for the calibration of analytical and numerical models dedicated to the estimation of the impact of TBM excavation on neighboring constructions, in particular those based on piles.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA