Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Más filtros











Base de datos
Intervalo de año de publicación
1.
Int J Coal Sci Technol ; 9(1): 87, 2022.
Artículo en Inglés | MEDLINE | ID: mdl-36441620

RESUMEN

The assessment of yielding rockbolt performance during rockbursts with actual seismic loading is essential for rockburst supporting designs. In this paper, two types of yielding rockbolts (D-bolt and Roofex) and the fully resin-grouted rebar bolt are modeled via the "rockbolt" element in universal distinct element code (UDEC) after an exact calibration procedure. A two-dimensional (2D) model of a deep tunnel is built to fully evaluate the performance (e.g., capacity of energy-absorption and control of rock damage) of yielding and traditional rockbolts based on the simulated rockbursts. The influence of different rockburst magnitudes is also studied. The results suggest that the D-bolt can effectively control and mitigate rockburst damage during a weak rockburst because of its high strength and deformation capacity. The Roofex is too "soft" or "smooth" to limit the movement of ejected rocks and restrain the large deformation, although it has an excellent deformation capacity. The resin-grouted rebar bolt can maintain a high axial force level during rockbursts but is easy to break during dynamic shocks, which fails to control rapid rock bulking or ejection. Three types of rockbolts cannot control the large deformation and mitigate rockburst damage effectively during violent rockbursts. The rockburst damage severity can be significantly reduced by additional support with cable bolts. This study highlights the effectiveness of numerical modeling methods in assessing the complex performance of yielding rockbolts during rockbursts, which can provide some references to improve and optimize the design of rock supporting in burst-prone grounds.

2.
Energies (Basel) ; 15(10): 3797, 2022 May.
Artículo en Inglés | MEDLINE | ID: mdl-35911128

RESUMEN

In Canada, many mines have adopted the sublevel stoping method, such a blasthole stoping (BHS), to extract steeply deposited minerals. Sill pillars are usually kept in place in this mining method to support the weight of the overburden in underground mining. To prolong the mine's life, sill pillars will be recovered, and sill pillar recovery could cause failures, fatality, and equipment loss in the stopes. In this paper, three sill pillar recovery schemes-SBS, SS1, and SS2-were proposed and conducted to assess the feasibility of recovering two sill pillars in a hard rock mine by developing a full-sized three-dimensional (3D) analysis model employing the finite element method (FEM). The numerical model was calibrated by comparing the model computed ground settlement with the in situ monitored ground settlement data. The rockburst tendency of the stope accesses caused by the sill pillar recovery was assessed by employing the tangential stress (Ts) criterion and burst potential index (BPI) criterion. All three proposed sill pillar recovery schemes were feasible and safe to recover the sill pillars in this hard rock mine, and the scheme SBS was the optimum one among the three schemes.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA