RESUMEN
Excessive or insufficient gestational weight gain (GWG) leads to diverse adverse maternal and neonatal outcomes. There is evidence that pregestational body mass index (pBMI) plays a role in GWG, but no genetic cause has been identified. In this review, we aim to analyze genotype variants associated with GWG. Results: We identified seven genotype variants that may be involved in GWG regulation that were analyzed in studies carried out in Brazil, Romania, the USA, Turkey, Ukraine, and Canada. Some genetic variants were only associated with GWG in certain races or depending on the pBMI. In women who were obese or overweight before gestation, some genetic variants were associated with GWG. Environmental and genetic factors together showed a greater association with GWG than genetic factors alone; for example, type of diet was observed to have a significant influence. Conclusions: We found little scientific evidence of an association between genotype variants in countries with a high prevalence of women of reproductive age who are overweight and obese, such as in Latin America. GWG may be more dependent on environmental factors than genetic variants. We suggest a deeper study of genetic variants, cytokines, and their possible association with GWG, always with the respective control of potential cofounding factors, such as pBMI, diet, and race.
Asunto(s)
Ganancia de Peso Gestacional , Sobrepeso , Recién Nacido , Femenino , Humanos , Masculino , Embarazo , Sobrepeso/complicaciones , Aumento de Peso/fisiología , Obesidad/complicaciones , Dieta , Índice de Masa Corporal , Resultado del EmbarazoRESUMEN
Resumen ANTECEDENTES: El parto diferido o asincrónico ocurre cuando los fetos de un embarazo múltiple nacen con una diferencia de días o semanas. La finalidad es incrementar la edad gestacional del segundo gemelo y aumentar la tasa de supervivencia. CASO CLÍNICO: Paciente primigesta de 39 años, con embarazo gemelar bicorial, biamniótico logrado mediante fertilización in vitro. En la semana 23 + 2 acudió a urgencias por sangrado vaginal y dolor abdominal. En la especuloscopia se observó líquido amniótico claro y dilatación cervical de 4-5 cm. El registro cardiotocográfico reportó dinámica uterina franca. En la ecografía se visualizaron dos fetos: el primero en presentación podálica sin latido cardiaco y el segundo en transversa con latido cardiaco. Después del nacimiento del primer gemelo se observó la retracción del cuello uterino y desaparición de la dinámica uterina. El estudio ecográfico mostró la bolsa amniótica íntegra, sin signos de desprendimiento placentario ni pérdida del bienestar fetal. Se propuso a la pareja la posibilidad de realizar un cerclaje cervical y diferir el parto del segundo gemelo, hecho que fue aceptado. Se consiguió prolongar la gestación del segundo gemelo 77 días, que nació mediante parto, sin morbilidad materna ni fetal. CONCLUSIONES: El parto diferido es una práctica adecuada para incrementar la tasa de supervivencia del feto o fetos retenidos. Los protocolos asociados con este tipo de partos son variados. Se requieren estudios adicionales para establecer los criterios de tratamiento de este tipo de partos.
Abstract BACKGROUND: Delayed Interval delivery or asynchronous birth is when a multiple pregnancy`s fetuses are not born simultaneously, and with several day´s difference between their births. This practice´s objective is to increase the second twin´s gestational age and, as such, improve its survival rate. CLINICAL CASE: A 39 years-old patient with bicorial biamniotic twin pregnancy achieved by in vitro fertilization. At 23 + 2 weeks of pregnancy assisted to Emergency service for vaginal bleeding and abdominal pain. In the speculoscopy a clear amniotic fluid and cervical dilation of 4-5 cm was observed. The cardiotocographic record reported frank uterine dynamics. In the ultrasound, two files are displayed: the first in the syntax presentation in the heartbeat and the second in the transversal with heartbeat. After the birth of the first twin, retraction of the cervix and the disappearance of uterine dynamics were observed. The ecological study showed the amniotic bag intact, without signs of placental detachment or loss of fetal well-being. It was proposed to the couple the possibility of performing the cervical fence and the other part of the second day, which was accepted. It was possible to prolong the gestation of the second year to 77 days, which was born through childbirth, without registering maternal or fetal morbidity. CONCLUSIONS: Delayed Interval delivery is a good practice to increase the survival rate of a retained fetus or retained fetuses. The protocols associated with this type of births are varied. Additional studies are required to establish treatment criteria for this type of births.
RESUMEN
Resumen El sismo del 19 de septiembre de 2017 en México causó daños catastróficos en el estado de Morelos que afectaron a más de 23 000 inmuebles en prácticamente todos los municipios del estado. Después de un sismo, resultan de gran importancia las acciones de emergencia existentes en la región para dar apoyo a la sociedad, tanto en el rescate de personas atrapadas como en la evaluación de la condición estructural que presentan los inmuebles, y de esta manera, mitigar sus efectos. Las acciones de emergencia requieren de planeación, organización, recursos económicos y materiales y, sobre todo, de trabajo en equipo. Desafortunadamente muchas sociedades no están preparadas para contener grandes desastres, por lo que puede resultar muy difícil hacer frente a una gran emergencia sin las condiciones adecuadas. Durante la emergencia del 19 de septiembre se vivió una situación jamás esperada en el estado de Morelos por los daños provocados por el sismo de magnitud 7.1, con epicentro a menos de 75 km de distancia, que puso a prueba al sistema de emergencia del estado. De manera particular, investigadores del Instituto Nacional de Electricidad y Energías Limpias (INEEL) iniciaron acciones de inspección en los inmuebles de su propio instituto, y posteriormente se pusieron a las órdenes de Protección Civil del Estado de Morelos para realizar inspecciones post-sísmicas de los inmuebles de gobierno, escuelas y, en general, de las viviendas de Morelos. La tarea principal del apoyo del INEEL consistió en dictaminar si los inmuebles debían continuar operando o ser habitables, si debían ser desalojados para hacer una revisión detallada o incluso si debían ser demolidos debido al alto riesgo de colapso que presentaban. El apoyo proporcionado por el INEEL no sólo se concentró en la evaluación post-sísmica de los inmuebles, sino que ha sido el inicio de una mayor colaboración con las autoridades del Estado, que resultará en el mejoramiento de los planes de emergencia y, sobre todo, en la actualización de las normas de diseño.
Abstract The earthquake of September 19, 2017 in Mexico caused catastrophic damage in the state of Morelos to more than 23 thousand structures in almost all municipalities. After an earthquake, emergency actions in the area are of great importance to support society, rescue trapped people as well as to assess the structural condition of the structures, and in this way, mitigate the negative effects. Unfortunately, society is not prepared to contain major disasters, and it can be very difficult to face a major emergency without the right conditions. The earthquake of September 19, with magnitude 7.1 and epicenter less than 75 km away, caused an emergency never expected in the state of Morelos, because of the damage it produced, which put Morelos' emergency system to the test. In particular, researchers from the National Institute of Electricity and Clean Energies (INEEL) initiated inspection actions in the buildings of their own institute, and subsequently placed themselves under the orders of the Civil Protection office of the State of Morelos to carry out post-seismic inspections of government buildings, schools and, in general, the homes of Morelos. The main task was to decide if the buildings were able to be inhabited again, if they should be evicted for a detailed review or if they should be demolished due to their high risk of collapse. The support was not only oriented to the post-seismic evaluation of the buildings, but was the beginning of working days with the State authorities, which will result in the improvement of the emergency plans and, above all, in the update of the design standards.